Pharmaceutical Automation Warehouse Project in Sichuan and Mianyang

Project Introduction

The project is designed with 5540 locations. The first floor is the outbound buffer area, using a circular conveying line to make the main line transport into the warehouse; the second floor production equipment using AGV transport to the second floor into the warehouse area, 1 inbound RGV is used, corresponding to 1 set of inbound and outbound conveying system.